Transportation Analysis

1. 1998- MASA Development Project [ Client: Petronas Carigali Sdn Bhd]

  • Transportation analysis and tie-down design for Sotong Jacket Platform STJT-A.

  • Transportation analysis and tie-down design for Malong Jacket Platform MLJT-A.

  • Transportation analysis and tie-down design for Anding Jacket Platform ADJT-A.

  • Transportation analysis and tie-down design for 16", 14", 12", 6" and 4" diameter linepipes.

 

2. 1999- SSB/ SSPC D35JT-C Development Project [ Client: Sarawak Shell Berhad/ Sabah

     Shell Petroleum Company (SSB/SSPC) ]

  • Transportation analysis and tie-down design for D35JT-C Jacket and Top Template.

 

3. 1999- Resak Development Project [ Client: Petronas Carigali Sdn Bhd]

  • Transportation analysis and tie-down design for Resak Central Processing Platform RCPP Jacket.

  • Transportation analysis and tie-down design for Resak Drilling Platform RDP-A.

  • Transportation analysis and tie-down design for Resak Malong Jacket Platform MLJT-A.

  • Transportation analysis and tie-down design, two block upending for Resak Flare Platform RFP Jacket.

  • Transportation analysis and tie-down design for MSF North and South.

  • Transportation analysis and tie-down design for Module 4, 5, 6and 7.

 

4. 1999- Resak PipelineDevelopment Project [ Client: Petronas Carigali Sdn Bhd]

  • Transportation analysis and tie-down design for the 28" diameter linepipes .

 

5. 2000- F6K-A Development Project [ Client: Sarawak Shell Berhad/ Sabah Shell Petroleum           Company (SSB/SSPC)]

  • Transportation analysis and tie-down design for F6K-A Jacket.

  • Transportation analysis and tie-down design for F6K-A Module and MSF.

  • Transportation analysis and tie-down design for F6K-A Bridge.

 

6. 2000- Angsi Development Project [ Client: Petronas Carigali Sdn Bhd]

  • Transportation analysis and tie-down design for ANDR-A Jacket.

  • Transportation analysis and tie-down design for ANDR-A Riser and Wellhead Topsides.

  • Transportation analysis and tie-down design for ANDR-A Flare Boom.

  • Transportation analysis and tie-down design for MSF North and South.

 

7. 2000- Angsi Development Project [ Client: Petronas Carigali Sdn Bhd]

  • Transportation analysis and tie-down design for the 32", 16", 12" and 6" diameter linepipes.

 

8. 2000- TMEP Total Myanmar Exploration and Production Underwater Inspection Project              [ Client: Total Myanmar Exploration and Production Ltd (TMEP)]

  • Transportation analysis and tie-down design for the Underwater Equipment on supply vessel "M.V. Norwich Service".

 

9. ****- Baobab Field Development [ Client: Modec International LLC]

  • Transportation analysis and tie-down design for Modules and Piperackss.

 

10. ****- EPMI Satellite Field Development [ Client: Barmada McDermott Sdn Bhd]

  • Transportation analysis and tie-down design for the Bintang and Seligi Jacket and Topside.

 

11. ****- PCSB E11R-C Field Development [ Client: Nippon Steel Coporation (NISCOMA)]

  • Transportation analysis for E11R-C Jacket.

  • Transportation analysis for E11R-C Topside, Piles and Conductor.

 

12. ****- SSB/SSPC E11K-A Field Development [ Client: Sarawak Shell Berhad/ Sabah Shell             Petroleum Company (SSB/SSPC)]

  • Transportation analysis for E11K-A Jacket.

  • Transportation analysis for E11K-A Topside, Piles and Conductor.

 

13. ****- SSB/SSPC B11DR-A Field Development [ Client: Sarawak Shell Berhad/ Sabah Shell             Petroleum Company (SSB/SSPC)]

  • Transportation analysis for B11DR-A Jacket.

  • Transportation analysis for B11DR-A Topside, Piles and Conductor.

 

14. ****- SSB/SSPC B11P-A Field Development [ Client: Sarawak Shell Berhad/ Sabah Shell             Petroleum Company (SSB/SSPC)]

  • Transportation analysis for B11P-A Jacket.

  • Transportation analysis for B11P-A Topside, Piles and Conductor.

 

15. ****- PCSB Jintan Field Development [ Client: Nippon Steel Coporation (NISCOMA)]

  • Transportation analysis for Jacket.

  • Transportation analysis for Topside, Piles and Conductor.

 

16. ****- PCSB Resak Field Development [ Client: Nippon Steel Coporation (NISCOMA)]

  • Transportation analysis for RCPP Modules 3, 4 and 5.

 

17. ****- SSB/SSPC M1PQ-A & M1DR-A Expansion Project [ Client: Sarawak Shell Berhad/               Sabah Shell Petroleum Company (SSB/SSPC)]

  • Transportation analysis for Miscelleneous Items.

 

18. ****- SSB/SSPC Removal and Transportation of KTMP-A and KTV-A Platform                                [ Client: Sarawak Shell Berhad/ Sabah Shell Petroleum Company (SSB/SSPC)]

  • Transportation analysis for Jacket.

  • Transportation analysis for Topside, Piles and Conductor.

 

19. ****- PCSB Angsi ANDP-C & ANDP-E Field Development [ Client: Nippon Steel Coporation         (NISCOMA)]

  • Transportation analysis for Jacket.

  • Transportation analysis for Topside, Piles and Conductor.

 

20. ****- PCSB Kinarut KINDP-A Field Development [ Client: Nippon Steel Coporation                     (NISCOMA)]

  • Transportation analysis for Jacket.

  • Transportation analysis for Topside, Piles and Conductor.

 

21. ****- Bulan-B (BLB) Field Development [ Client: Nippon Steel Coporation (NISCOMA)]

  • Transportation analysis for Jacket.

  • Transportation analysis for Topside, Piles and Conductor.

 

22. ****- Bulan-C (BLC) Field Development [ Client: Nippon Steel Coporation (NISCOMA)]

  • Transportation analysis for Jacket.

  • Transportation analysis for Topside, Piles and Conductor.

 

23. ****- Bumi-B (BMB) Field Development [ Client: Nippon Steel Coporation (NISCOMA)]

  • Transportation analysis for Jacket.

  • Transportation analysis for Topside, Piles and Conductor.

 

24. ****- Bumi-D (BMD) Field Development [ Client: Nippon Steel Coporation (NISCOMA)]

  • Transportation analysis for Jacket.

  • Transportation analysis for Topside, Piles and Conductor.

 

25. ****- Chevron Offshore (Thailand), MFP Stage II B Field Development [ Client: Nippon Steel         Coporation (NISCOMA)]

  • Transportation analysis for Jacke M08, M11, M12, M13 and M14 Wellhead Platform.

  • Transportation analysis for Topside M08, M11, M12, M13 and M14 Wellhead Platform.

 

26. ****- Guntong-E Platform [ Client: MMC Oil and Gas Sdn Bhd]

  • Transportation feasibility study and motion analysis on the EPMI Design of Topside.

 

27. ****- Baram South Field Development [ Client: MMC Oil and Gas Sdn Bhd]

  • Transportation feasibility study and motion analysis for Jacket.

  • Transportation feasibility study and motion analysis for Topside.

 

28. 2013- Garagol Deniz West Oil Development Project [ Client: Petrofac RNZ Sdn Bhd]

  • Transportation analysis for GDDP-A Drilling Jacket Platform.

  • Transportation analysis for GDDP-A Drilling Topside Platform.

 

29. 2014- Magtymguly Gas Recycling Development Project [ Client: Petrofac RNZ Sdn Bhd]

  • Transportation analysis and tie-down design for Drilling Platform MDP-B Jacket.

  • Transportation analysis and tie-down design for Drilling Platform MDP-B Topside.

  • Transportation analysis and tie-down design for Gas Compression Platform MK-A Jacket.

  • Transportation analysis and tie-down design for Gas Compression Platform MK-A Topside.

  • Transportation analysis and tie-down design for Utility & Living Quarters MQ-A Jacket.

  • Transportation analysis and tie-down design for Utility & Living Quarters MQ-A Topside.

 

30. 2016- SK310 B15 Development Project  [ Client: Petrofac RNZ Sdn Bhd]

  • Transportation motion analysis for B15 Jacket Platform.

  • Transportation motion analysis forB15 Topside Platform.