top of page

Pipelay Analysis

1. 1998- MASA Pipeline Development Project [ Client: Petronas Carigali Sdn Bhd]

  • Pipelay analysis for the STJT-A/FPSO 16" diameter pipeline.

  • Pipelay analysis for the SCP/FPSO 12" diameter pipeline.

  • Pipelay analysis for the MLJT-A/FPSO 14" diameter pipeline.

  • Pipelay analysis for the MLJT-A/FPSO 6" diameter pipeline.

  • Pipelay analysis for the MLJT-A/FPSO 4" diameter pipeline.

 

2. 1999- Baram BAJT-D/BADP-A Field [ Client: Petronas Carigali Sdn Bhd ]

  • Pipelay analysis for the BAJT-D/BADP-A 6" diameter pipeline.

 

 

bottom of page